Please read our terms and conditions on the use of HER data.
Monument MPM786 - DOCKS 1 TO 6 (CONSECUTIVE) QUAY WALLS AND BOLLARDS (INCLUDING NORTH AND SOUTH CAMBER MAST POND AND TUNNEL TO SAME)
Summary
Map
Type and Period (7)
- DRY DOCK (Georgian to 21st Century - 1750 AD? to 2050 AD)
- DOCK BASIN (Georgian to 21st Century - 1750 AD? to 2050 AD)
- QUAY (Post Medieval to 21st Century - 1540 AD to 2050 AD)
- FAIRLEAD (19th century to 21st Century - 1801 AD to 2050 AD)
- MOORING BOLLARD (19th century to 21st Century - 1801 AD to 2050 AD)
- MAST POND (Post Medieval to 21st Century - 1540 AD to 2050 AD)
- TUNNEL (Post Medieval to 21st Century - 1540 AD to 2050 AD)
Full Description
The text below has been taken from the Listed Building entry. Additional details for the Mast Pond and tunnel are recorded under HER Monument Records MPM2145 and MPM1099 respectively.
Basin and docks with bollards and fairleads; quay retaining wall; mast pond now boat pond and tunnel to the latter. Mostly mid C18- early C 19, from 1796 under the direction of General Samuel Bentham (Inspector General of Naval Works); mast-pond 1665; bollards and fairleads mid C19. C19 and C20 repairs and alterations. Large blocks of tooled coursed, squared, stone with Roman numerals indicating water levels and round- cornered granite kerb-stones with iron mooring rings inset. Other mooring rings fixed to walls at lower levels. Tunnel has vault of red bricks. Iron mooring rings, bollards and fairleads. EXTERIOR: a complete complex of late C18 and early C19 ship building and repairing docks with associated quay walls and mooring fixtures. Docks have stepped sides with flights of steps and haulage slides; some retain later metal gates. Dock No.4 has floor with central strip of granite setts flanked by brick paving. Quay and basin walls have narrow flights of steps and on north side of entry to North Camber is Kings Stairs, a flight of steps with wide, shallow, treads (resurfaced). On north side of Kings Stair Jetty is slipway of granite setts, with three cannon barrels reused as bollards. Basin entry on south side is inscribed "BRITANNIA ?th June 1801" (year of completion of basin extension, see below). Bollards are mostly square on plan with curved tops and embossed lettering, "VR" (they are similar to those associated with the 1840s-60s No.2 Basin and docks, not included). Mast pond, of rectangular plan, has granite corbels to carry boathouses above (qqv Boathouse Nos 5 and 7). The tunnel entries are segmental-arched with giant voussoirs aligned to the stonework courses, and at west end are recesses for former lock gates (added 1797, Riley p7). The west entry ( off South Camber) appears to have the quay wall built up against it (indicating possibly earlier date of tunnel). HISTORY: the mast pond was dug in 1665 (Naval Heritage at Portsmouth Visitors' Guide), and is constructed of diagonally-tooled stone (the stonework of the other walling, and also of the 1690s Basin which survives under the Block Mills (qv) is vertically tooled). The Basin and docks are on the site of the late C15 dockyard. This was replaced by a large basin and 2 dry docks constructed 1689-98 under the direction of Edward Dummer, Surveyor to the Navy Board. One of the dry docks, replaced by the present No.5 Dock, was important in being, along with Dummer's contemporary dry dock at Plymouth, the first in England to have stepped stone sides instead of timbering (Coad, 1981, p11). The existing basin incorporates parts of the 1690s basin which was reduced in size in the C18 and subsequently enlarged under the direction of Bentham incorporating 2 important features: 1) Bentham's inverted masonry arch tying together the entrance walls was probably the first use of the inverted arch principle in dock building; 2) Bentham also made use of John smeaton's waterproof cement (Riley p12). Dock No.1 was constructed 1790-1801; Dock No.2, 1799-1802, designed by Bentham, contractors Parlby and Rankin; Dock No.3, 1799-1803, designed by Bentham; Dock No.4, 1772 replacing 2 building slips of early-mid C18; Dock No.5, 1769 incorporating 1690s work; Dock No.6 (on site of Dummer's smaller dry dock of 1690s), 1737-43, modified 1760s and 1777, and rebuilt 1810; North Camber, 1773-85, contractors Templar and Parlby, designed to give .more wharfage capacity for loading and unloading. Docks were built with wooden floors until Bentham introduced the principle of using masonry floors. The quayside capstans were originally steam-powered being converted to compressed air early C20. Noted by Coad (1989, p97) as "the finest surviving group of such eighteenth century structures in Europe". (Sources: Coad J: Historic Architecture of HM Naval Base Portsmouth 1700- 1850: Portsmouth: 1981: 11 ; Coad J: The Royal Dockyards 1690-1850: Aldershot: 1989: 97 ; The Portsmouth Papers: Riley RC: The Evolution of the Docks and Industrial Buildings in Portsmouth: Portsmouth: 1985: 3-12 ; Portsmouth Naval Base Property Trust: Naval Heritage at Portsmouth -Visitor's Guide: Portsmouth: 1988; Winton J: The Naval Heritage of Portsmouth: 1985: 46, 104).
Selected Sources
Book Reference - Title: Naval Heritage at Portsmouth - Date: 1988
Book Reference - Author: Coad, J - Title: Historic Architecture of H M Naval Base Portsmouth 1700-1850 - Date: 1981 - Page References: 11
Book Reference - Author: J Winton - Title: The Naval Heritage of Portsmouth - Date: 1985 - Page References: 46, 104
Article Reference - Author: RC Riley - Title: The Evolution of the Docks and Industrial Buildings in Portsmouth - Date: 1985 - Journal Title: The Portsmouth Papers - Page References: 3-12
Book Reference - Author: Coad, JG - Title: The Royal Dockyards 1690-1850: architecture and engineering works of the sailing navy - Date: 1989 - Page References:
<1> Historic England, The National Heritage List for England (Index). SPM35.
Sources/Archives (1)
- <1> SPM35 Index: Historic England. The National Heritage List for England.
Protected Status/Designation
- Conservation Area 22: HM Naval Base and St George's Sqaure
- Listed Building (I) 1272267: DOCKS 1 TO 6 (CONSECUTIVE) QUAY WALLS AND BOLLARDS (INCLUDING NORTH AND SOUTH CAMBER MAST POND AND TUNNEL TO SAME)
- Scheduled Monument PO397: Portsmouth Dockyard, the Docks
Other Statuses/References
- None recorded
Related Monuments/Buildings (6)
- Parent of: Dock floor, Dry Dock No.3 Portsmouth Historic Dockyard (Monument) (MPM2036)
- Parent of: Dock wall and construction cut, Dry Dock No. 3, Portsmouth Historic Dockyard (Monument) (MPM2035)
- Parent of: Limestone and timber structures, Dry Dock No.3, Portsmouth Historic Dockyard (Monument) (MPM2037)
- Parent of: Limestone walls and steel rail, Dry Dock No 3, Portsmouth Historic Dockyard (Monument) (MPM2034)
- Related to: Mast Pond (Boat Pond), Portsmouth Dockyard (Monument) (MPM2145)
- Related to: Tunnel Connecting Mast Pond to Harbour, Portsmouth Dockyard (Monument) (MPM1099)
Related Events/Activities (7)
- Event - Intervention: A Watching Brief for the Instalation of a Compressed Air Pipeline in the North Eastern Corner of HMS Victory Dry Dock (Dry Dock no. 2) (EPM167)
- Event - Intervention: Archaeological Monitoring of Geotechnical Works at the Portsmouth Historic Dockyard (EPM265)
- Event - Intervention: Archaeological Watching Brief at Boathouse No. 6 and the Recording of Boathouse No. 4 Locks, Portsmouth Dockyard, Hampshire (EPM96)
- Event - Intervention: Archaeological Watching Brief at the Mary Rose New Museum Portsmouth Historic Dockyard (EPM218)
- Event - Intervention: Archaeological watching brief on excavation of three pits to investigate geophysical anomalies shown up on Ground Probing Radar Survey, Dry Dock No. 3 (EPM229)
- Event - Survey: Ground Probing Radar Survey Mary Rose Centre, H.M. Naval Base, Portsmouth (EPM228)
- Event - Intervention: Mary Rose New Museum Archaeological Watching Brief Phase 4 (EPM272)
Finds (0)
Location
| Grid reference | Centred SU 628 005 (82m by 354m) (2 map features) |
|---|---|
| Unitary Authority | Portsmouth City |
Record last edited
Jul 1 2026 11:51AM